Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8064428
![](http://i.b2b168.com/e/tag_cmjz.gif)
- Product Categories
- Friendly Links
Information Name: | First aid supply rail device (save the rail device) |
Published: | 2012-03-13 |
Validity: | 30 |
Specifications: | Complete |
Quantity: | 1.00 |
Price Description: | Negotiable |
Detailed Product Description: | Emergency rail device (save the rail device) JGQ based emergency rescue device also known as rail tracks Features: The product quality is reliable, easy to operate, versatile and safe to use Rail aid device is widely used in the railway sector, temporary public works rescue tools, emergency break in the rail, in order to train properly adopted, can be the appropriate type of fish plate rail (rail joint bar) button in the faults of the rail on both sides, device from the rail in the bottom of the first-aid stuck to the fish plate bottom, the top emergency control panels on both sides of fish were temporary. As a set of two first-aid device added to the joint bar on the same time, first-aid device position respectively in the splint at the end of the first 100MM in immediately with a quick wrench with emergency locking device bolts. Can make the normal speed of the train by a lower security. First aid is divided into 43 types, 50, 60 type, 75 type corresponding to the rail model to use. Emergency Rail Features: A. On the line for all types of injury is determined to reinforce the welding zone. II. Rail or when welding with a broken emergency reinforcement. III. Aluminum heat welding, pressure welding, resistance welding welding with solid all-around at the injury is caught. Sleeper in the sleeper or between the injury is on the rail for clamping round handle. Alloy steel casting molding, handsome in appearance, light weight, easy to carry, impact resistance, long service life. IV. In every km mark and half a kilometer mark the bottom of alternate set of tracks, is very timely and easy to use. Five. Rail operators do not carry when broken drum kits and first aid splint onto the scene, reducing the labor intensity of workers, greatly reducing the processing time off track. VI. Injury is reinforced rail after installation to ensure the normal operation of the train. (This product length: 240mm Weight: 18kg) The rail loading and unloading convenient and flexible first aid devices, clamping solid and reliable, portable toolbox then, the railway works departments to facilitate the temporary relief of rail fracture repair tools for reliable Contact: Miss Cheng Tel: 0537 - |
Admin>>>
You are the 53803 visitor
Copyright © GuangDong ICP No. 10089450, Mining Co., Ltd. Jining hillo All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 53803 visitor
Copyright © GuangDong ICP No. 10089450, Mining Co., Ltd. Jining hillo All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility