Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8064428
![](http://i.b2b168.com/e/tag_cmjz.gif)
- Product Categories
- Friendly Links
Information Name: | Supply of the SWP-10A Manual Hydraulic Bending row machine |
Published: | 2012-03-13 |
Validity: | 300 |
Specifications: | The SWP-10A |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | SWP-10A Manual Hydraulic Bending row machine SWP-10A Manual Hydraulic Bending row machines - hillo mining equipment plant SWP-10A Manual Hydraulic Bending row machine, manual hydraulic bending row machine, hydraulic bending row, bent row machine, copper and aluminum row curved row of machines, manual bend row machine Aluminum and copper row width 40,50,60,80,100,120,125 Factory direct SWP-10A Manual Hydraulic Bending row machine, the SWP-12A Manual Hydraulic Bending row machine First, use Xinlong brand manual hydraulic curved row of machines for bending row of aluminum, copper, used in industrial and mining enterprises, substations, power plants, is the ideal curved row of hydraulic tools. Specifications and performance parameters of the hydraulic bending row machine 1, Model: SWP-10A 2, the maximum working pressure: 63MPa 3, the maximum working stroke: 250mm 4, the scope of the curved row: aluminum and copper row width 40,50,60,80,100,120,125 Thickness :4-10mm 5, the bending angle: α ≥ 90 ° 6, bending radius: 2.5 times the row width 7, fuel tank capacity: 2kg 8, hydraulic oil grades: N15 9, the maximum operating force: ≤ 400N The characteristics of the SWP manual hydraulic bending row machine (manually bent row, integral bent row machine) using high quality materials and advanced processing technology, high speed and the time between failures long. A new curved aluminum row, the new amount of copper bars tool, it has a reasonable structure, easy to operate, safe to use. Third, the structure By the hand pump (electric pump) (16), high pressure; pipeline (13) quick coupling (2), the working cylinder (1), curved row of components (including the next flower board, plywood mold head, at right angles to the die roll column, R templates) composition. Annex sketch: Fourth, using the methods and precautions 1, use: a first working cylinder (1) inserted into the side of block (3) hole, the nut screwed in the end. The nut and the side of block try to be re-tighten the wing screws, and then pressure the executive end of the quick coupling activities of the Ministry of coat pulled back, and sets to get started in the working cylinder joints to relax, active part of the recovery to the original own labeled, and then pump the oil drain screw (15) tightened to the same work after the oil drain screw to relax, work cylinder Will automatically retract. b, horizontal curvature (Figure see a) Open flower pull (4) the head of the plywood mold (8) put into the working cylinder head, according to the thickness of the curved row of R, R template (7) and aluminum row Or with the copper bars into the plywood die, and then pressed plywood, two roll width of column (6) corresponds to row toward the aluminum row and copper thickness, and placed in the appropriate size hole, and then spend on board cover the curved aluminum row or copper bars into the top slot, but the row to be stretched out roller column more than 100mm, such as if the largest firms and over more than 200mm, can be accessed by a long mandrel - caps into the working cylinder head, the other one put into a splint die can still operating. vertical bending (Figure 2), open on the flower board, will be at right angles to die (9) put into the working cylinder head, the next flower pull the plug in the two 22 pin (5) holes (18) ( 11), and then spend plate covered with row of aluminum or copper discharge between the pin and the rectangular die to work, the minimum distance between the two at right angles to the bend for the 40mm curved R row, such as vertical bending open on the flower board bar linkage plate (10) inserted in the T-shaped connector 12 long bolts, rod joint board into two 22 pin to work. d, all in accordance with the standard row width x2.5 bending radius R and the bending angle d> 90 degree bend under the conditions that can rebound angle. e, roller column with five slots, two end use, end of the position below the flower board to the slot under the mouth of 64mm, such as with the other end of the required turn around and use. f, fuel pump domestic demand, you can remove the oil pump of the end of the rubber cover (14) then spin to the M8 socket head cap screws, exposing the installed pipeline to refuel. g, copper row to be tempered in order to use. h, R100, of R125, R150, curved 8mm row combined with two 4mm plate bending 6mm the use 5mmR board on behalf of. J, the electric pump, please refer to the electric pump manual. 2 Notes a use such as the phenomenon of air play, can be the first unscrew the pump on the oil drain screw set The pump vertical up and head down the empty play a few and then tighten the oil drain screw, you can continue To use. b, when the load to avoid the quick connector to remove the. c, the machine is oil as a medium, you must do a good job of cleaning and maintenance of oil and the machine work. For, in order to avoid blockage or leakage affect the results. Sales Manager: Cheng Ning Tel 0537 -2886667 Mobile phone: 15053792050 Working: 1,729,583,493. Want No.: cnfd5201 Company Website: http://cnfd5201.b2b.youboy.com/ http://cnfd5201.cn.alibaba.com/ |
Admin>>>
You are the 53803 visitor
Copyright © GuangDong ICP No. 10089450, Mining Co., Ltd. Jining hillo All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 53803 visitor
Copyright © GuangDong ICP No. 10089450, Mining Co., Ltd. Jining hillo All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility