Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8064428
![](http://i.b2b168.com/e/tag_cmjz.gif)
- Product Categories
- Friendly Links
Information Name: | Supply DL-5 multi-function devices pull rail |
Published: | 2012-03-13 |
Validity: | 300 |
Specifications: | DL-5 |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | DL-5 multi-function pull-rail device First, the use of: DL multifunction device is factory pull rail railway works newly developed equipment for 50,60,75 kg / m rail stress relief operations. Rail joints can also be used for the adjustment of rail operations. Is also a large pull-rail device, can pull the rail operations, as traction can pull heavy rail and long rail. Second, the structural characteristics: 1, the machine is better than other similar products, using the split-site assembly structure, including two grips, four wedge, two cylinder piston rod assembly and into the return pipe. Simple, very easy to assemble. 2, the machine uses two clamp bodies hostage and kidnapped two wedge on both sides of the top rail of the track surface, held hostage by a solid, non-skid, better than similar products of other hostage institutions (such as hostage waist rail tracks, parts and more and track at the end of ballast must be removed,) do not Dao residue. 3, The machine is mainly used in rail stress relief operations, and can be a machine, you can two-way operation, that is able to pull the track, but also push the rails, rail joints so you can adjust the device to adjust instead of rail joints, rail and pull the device can replace to pull the rail and pull rail tension than the tension device several times larger. 4, the whole sleeper bolts in the above, do not hide when the bolt or bolt down. Main technical parameters: Rated Lhagoi hydraulic 50MPa Rated pull 710KN Rated hydraulic push rail 30MPa Rated thrust 570KN Working stroke 500mm The use of methods: 1, the rail preparatory work before stress relief a. Sent diffuse range of sleeper fastening bolts, placed back rail. b. An appropriate distance from the bottom of every rail sleepers put in a roll bar, so that the bottom rail and the rail base plate separation. c. The fish plate at one end connected to a bolt on one end of the rail, fish plate rail end clip into the other end of the root. 2, device installation Lhagoi a. Connectivity of the oil, start the electric pump is a piston rod travel all out. b. The clamp were placed on two rails, insert the wedge, placed cylinder, piston rod assembly, one end of the cylinder is connected on the rail on the fish plate. c. Adjust the installation settings. Cylinder port where the rails end to end stuck around outside 40 mm. Then worst of both ends of the wedge. If you pull the track length of 300 mm, where the rail tank stuck face to face than 160 mm or so. 3, the stress relief operation a. Fastener release, it has one person every 50 meters with a hammer tap the diffuse rail; electric pumping station to change, slowly pulling two rails near. (Note: as long as the rails do not move too much increase in the oil.) b. When the two rail tracks down the appropriate joints, electric pump to maintain a certain pressure. c. Fish plate on the other end of the bolt, and tighten all the fish plate bolts. d. Roll out of the bar, tighten all the bolts fastening the bottom rail. e. Electric pump for bribery, reverse into the oil, one end of the clamp to lose hostage, close electric pumping station, with a hammer the other end of clamp vibration, so that loss of hostage status, then remove the cylinder from the pull rail track devices, operating completed. Fifth, safety precautions: 1, full-electric pumping station operators should keep pressure gauge reading experience, not the emergence of over-pressure phenomenon. 2, all the work processes should be required to use to work. 3, the fuel tank and solid wedge must fall to the tank. 4, piston rod extended, retracted in place should be immediately suspended without overpressure. 5, the tubing of the street should not touch the ground, contact with stolen goods, to prevent the magazine into the oil inside. |
Admin>>>
You are the 53803 visitor
Copyright © GuangDong ICP No. 10089450, Mining Co., Ltd. Jining hillo All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 53803 visitor
Copyright © GuangDong ICP No. 10089450, Mining Co., Ltd. Jining hillo All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility